Asbestos Inspector License #19-05867
Call (212) 401-6007admin@asbestosremediation.nyc

Asbestos Removal in Brooklyn

AsbestosRemediation.nyc reviews lab results and renovation plans for Brooklyn buildings and coordinates the licensed contractors, filings and air monitoring for asbestos removal.

Request an Abatement Scope Review

Request an Abatement Scope Review

What Brooklyn Owners Should Know Before Asbestos Removal

Asbestos removal in Brooklyn usually comes up during a renovation. Brownstones and pre-war apartment buildings were built long before 1987, and NYC DOB notes that buildings from before 1987 may have asbestos in pipe and equipment insulation, walls, floors, ceiling tiles and roofing.

Opening a wall, replacing a boiler, pulling up old flooring or gutting a kitchen can disturb that material. Before DOB issues a permit for that kind of work, an asbestos assessment is required, and any asbestos project has to be filed, abated and closed out with DEP.

We coordinate asbestos abatement in Crown Heights, Park Slope, Bed-Stuy and every other Brooklyn neighborhood the same way: lab results first, then licensed contractors, filings and clearance.

Brooklyn Renovation Permits and Asbestos Rules

Brooklyn projects follow the same City and State rules as the rest of New York City:

  • Assessment before permits: DOB requires an asbestos assessment before issuing permits for work in pre-1987 buildings, unless an Asbestos Exemption Certification applies
  • Buildings constructed after April 1, 1987: alterations can be exempt from DEP asbestos certification under Administrative Code Section 28-106.1, but known asbestos that the work will disturb still has to be abated
  • ACP-5: when the work is not an asbestos project, a DEP-certified asbestos investigator files an Asbestos Assessment Report (ACP-5)
  • ACP-7: work that disturbs more than 25 linear feet or more than 10 square feet of asbestos-containing material is an asbestos project, filed with DEP at least one week before work
  • Permit sign-off: DOB moves forward with the permit after DEP issues ACP-21 or ACP-20 completion forms
  • State notice: Large projects (160 square feet or 260 linear feet or more) need NYS DOL notice 10 calendar days ahead
  • Occupied buildings: residents and businesses on the work floor and the floors directly above and below get written notice 10 calendar days before work
  • Shared spaces: work in stairs, hallways, lobbies or near fire protection systems can trigger a DEP Asbestos Technical Review Unit permit with a Work Place Safety Plan
  • Licensed work: abatement is done by a contractor with a NYS DOL asbestos handling license, with air sampling by an independent firm
Project lead reviewing renovation plans inside an older masonry building
How it works

How We Coordinate a Brooklyn Asbestos Project

01

Review the building

We review the lab results or ACP-5 against your plans and the building's age, layout and occupancy.

02

Set the filing path

We identify whether the work needs an ACP-5, an ACP-7, DOL notice or Asbestos Technical Review Unit review.

03

Coordinate licensed work

A licensed abatement contractor and an independent air monitor are scheduled around residents and other trades.

04

Close out for DOB

Clearance results and DEP completion forms are collected so the DOB permit can move forward.

What Is Included?

Our Brooklyn asbestos coordination may include:

  • Review of asbestos lab results, surveys or an existing ACP-5 for the building
  • Comparison of the findings with the renovation or alteration plans
  • A check of the materials DOB flags in older buildings, such as pipe insulation, walls, flooring, ceiling tiles and roofing
  • Determination of the DEP and DOL filing path for the project size
  • Coordination of properly licensed abatement contractors and certified workers
  • Coordination with an independent air monitoring firm
  • Coordination of the 10 day notice to residents and businesses
  • Planning around shared stairs, halls and egress in occupied buildings
  • Tracking of ACP-7, ACP-8 and completion forms against the DOB permit schedule
  • Organization of clearance, waste and closeout records for the owner's files

Why Asbestos Planning Matters for Brooklyn Renovations

In a brownstone or walk-up, the work area often shares a stair and hallway with the people who live there. Rule 56 requires written notice to occupants 10 calendar days before work, and work that affects egress can trigger added DEP review. DEP inspectors can stop abatement that should have had that review and did not.

Planning also keeps the permit on track. On a construction job, DOB will not issue a permit until DEP completion forms show the asbestos work is done, so asbestos work has to be scheduled ahead of the rest of the renovation.

Who It’s For

Our Service Is Designed For:

  • Brownstone and row house owners
  • Owners of multifamily and mixed-use buildings
  • Co-op and condo boards
  • Property managers
  • Architects and engineers filing with DOB
  • General contractors
  • Developers renovating older buildings
  • Commercial tenants on retail corridors
  • Buyers planning work after closing

Why Choose AsbestosRemediation.nyc?

AsbestosRemediation.nyc reads lab results against the actual renovation plans for older Brooklyn buildings, so the abatement scope covers the walls, floors and systems your work will open.

We coordinate the licensed abatement contractor, the independent air monitor and the DEP and DOL filings in one project record, and the same approach applies to asbestos removal NYC-wide. Abatement and air monitoring are performed by properly licensed contractors and certified personnel.

About Us
ABOUT US

NYC Asbestos Remediation Coordination for Projects That Need to Move

AsbestosRemediation.nyc coordinates the entire path from lab result review through licensed abatement, DEP/DOL filing support, air monitoring, and project clearance documentation.

Licensed contractor coordination

DEP/DOL filing and ACP-7 support

Full closeout documentation

Get in touch with us

Have asbestos lab results, an ACP-7 issue, or a DOB permit blocked by asbestos documentation? Send the project details and AsbestosRemediation.nyc will review the next steps.

Start typing and pick your address. The fields below fill in automatically.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Office
Get Started

Found Asbestos?

We’ll review the lab report, affected work scope, and project timeline, then identify the filing, abatement coordination, air monitoring, and closeout documentation path.